REACTOR DECOMMISSIONING STRATEGY: A NEW START FOR BNFL

机译:反应堆退役策略:BNFL的新起点

获取原文
获取原文并翻译 | 示例

摘要

The key points of BNFL Magnox Electric’s revised waste management and reactorrndecommissioning strategy for the reactor sites are:rn· Reactors will be defuelled as soon as practicable after shutdown.rn· Predominantly Caesium contaminated plant will be dismantled when it is no longerrnneeded.rn· Cobalt contaminated plant such as boilers will remain in position until the reactors arerndismantled, but appropriate decontamination technology will be regularly reviewed.rn· All buildings except the reactor buildings will be dismantled as soon as practicable afterrnthey are no longer needed.rn· Operational ILW, except some activated components, will be retrieved and packagedrnduring the Care and Maintenance preparation period. All wastes will be stored on site,rnand handled in the long term in accordance with Government policy.rn· Reactor buildings and their residual contents will be placed in a passive safe storage Carernand Maintenance condition in a manner appropriate for the site.rn· Contaminated land will be managed to maintain public safety.rn· The reactors will be finally dismantled in a sequenced programme with a start date andrnduration to be decided at the appropriate time in the light of circumstances prevalent atrnthat time.rn· Currently, the Company is considering a sequenced programme across all sites, notionallyrnbeginning around 100 years from station shutdown, leading to a range of deferral periods.rn· For provisioning purposes, the Company has costed a strategy involving reactorrndismantling deferrals ranging from 85 to about 105 years in order to demonstrate prudentrnprovisioning to meet its liabilities. A risk provision to reflect the potential for shorterrndeferral periods is included in the cost estimates.rn· The end point for reactor decommissioning is site clearance and delicensing, based on thernassumption that a reasonably practicable interpretation of the “no danger” clause in thernNuclear Installatio ns Act 1965 (as amended) can be developed.rnIn line with Government policy, and taking account of all relevant factors, this strategy will bernsubject to ongoing review and development and may be modified in the light of changedrncircumstances in the future.
机译:BNFL Magnox Electric修订后的废物管理和反应堆退役策略的重点是:•反应堆在关闭后将在可行的情况下尽快加油。rn•当不再需要铯污染的工厂时,将其拆除。rn•钴受污染的设备(如锅炉)将保持在原位,直到对反应堆进行拆除为止,但将定期审查适当的去污技术。rn·除反应堆建筑物外,所有建筑物均将在可行后尽快拆除。在“保养和维护”准备期间,将检索并打包一些激活的组件。所有废物将按照政府政策长期存放在现场,并进行长期处理。rn·反应堆建筑物及其残余物将以适合现​​场的方式置于被动安全存放的“保养和维护”条件下。rn·受污染将对土地进行管理,以维护公共安全。rn·反应堆将最终按照有序计划进行拆除,启动日期和期限将根据当时的普遍情况在适当的时间决定。rn·目前,公司正在考虑一个跨站点的顺序计划,从概念上讲,它是从停站后约100年开始,导致一系列延期。rn·为了进行配置,公司已花费了涉及反应堆的策略,将拆除延期的时间范围从85到约105年,以证明谨慎的配置偿还债务。费用估算中包括了一项可反映出可能缩短延期的风险的准备金。rn·假设对核设施的“无危险”条款进行合理可行的解释,则反应堆退役的终点是现场清理和发牌。可以制定1965年法(经修订)。根据政府政策,并考虑到所有相关因素,该策略将受到不断的审查和发展,并且可能会根据情况的变化而进行修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号