Schedule Risk Analysis Simplified

机译:简化计划风险分析

获取原文
获取原文并翻译 | 示例

摘要

The critical path method (CPM) of scheduling a project is a key tool for project management. A schedule "network" represents the project strategy. Activities, where the work is accomplished, are linked by relationships (e.g. finish-start, start-start, finish-to-finish) showing how the work is planned. Strings of linked predecessor and successor activities constitute "paths" through the network. When two or more paths are to be done simultaneously, they are described as parallel paths. Some of the most important points in the project are where several parallel paths converge. At these merge or join points, the paths must all be completed before a milestone is recorded for payment, an inspection can be done, sub-assemblies can be integrated for testing or the project can be recorded as complete. CPM computes the shortest project completion duration and or completion data from the longest path through the network. The "longest pole in the tent" is called the "critical path". Any delay on the critical path will delay the project. Conversely, CPM shows that paths that are not critical can be delayed or lengthened, if they have enough "float" or scheduling flexibility, without necessarily delaying the project. On the one hand, the critical path method (CPM) of scheduling is traditional and well-accepted. It is essential for developing the logic of the project work and for managing the day-to-day project activites. On the other hand, the CPM schedule is only accurate if every activity is started "as soon as possible" and takes just as long as its duration estimate indicates. Project managers understand that projects do not ever go entirely according to plan, which is one reason for frequent status reviews. Since real projects do not work this way, CPM is just the beginning of project schedule management.
机译:计划项目的关键路径方法(CPM)是项目管理的关键工具。进度表“网络”表示项目策略。完成工作的活动通过关系(例如完成开始,开始开始,完成到完成)相互关联,以显示工作的计划方式。链接的前任活动和后继活动的字符串构成通过网络的“路径”。当要同时执行两个或更多路径时,它们被称为并行路径。项目中一些最重要的点是多个平行路径汇合的地方。在这些合并或联接点,必须记录所有路径,然后再记录里程碑以进行付款,可以进行检查,可以集成子部件进行测试或可以将项目记录为完整。 CPM计算出最短的项目完成时间和/或来自通过网络的最长路径的完成数据。 “帐篷中的最长杆”称为“关键路径”。关键路径上的任何延迟都将延迟项目。相反,CPM显示,如果非关键路径具有足够的“浮动”或调度灵活性,则可以延迟或延长这些路径,而不必延迟项目。一方面,调度的关键路径方法(CPM)是传统的并且被广泛接受。这对于开发项目工作的逻辑以及管理日常项目活动至关重要。另一方面,CPM时间表只有在每个活动都“尽快”开始并且花费的时间与估计的持续时间一样长时才是准确的。项目经理了解项目永远不会完全按计划进行,这是经常进行状态审查的原因之一。由于实际项目无法通过这种方式运行,因此CPM只是项目进度管理的开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号