首页> 外文会议>14th international conference amp; exhibition on liquefied natural gas (LNG 14) >COMPREHENSIVE EVALUTIONS OF LNG TRANSFER TECHNOLOGY FOR OFFSHORE LNG DEVELOPMENT
【24h】

COMPREHENSIVE EVALUTIONS OF LNG TRANSFER TECHNOLOGY FOR OFFSHORE LNG DEVELOPMENT

机译:海上LNG开发的LNG转移技术综合评价。

获取原文
获取原文并翻译 | 示例

摘要

Future development of LNG projects, whether for LNG export or LNG import, in offshore locations around the globe demand a critical and comprehensive evaluation of the current slate of available technologies for offshore LNG transfer. The transfer of LNG between floating offshore facilities and LNG carrier is arguably the weakest link of the total chain for offshore LNG development. rnSince the strength of a chain is only as strong as its weakest component, current offshore technology research and development efforts are concentrating their efforts on LNG transfer systems and technologies. Since the there is a spectrum of offshore LNG transfer technologies being developed by private companies or through joint industrial projects (JIPs), and the urgency of linking these developments to the evolving floating offshore LNG export or receiving terminal projects, a comprehensive comparison and critical evaluation of these emerging offshore LNG transfer technologies was initiated by ChevronTexaco in 2000 and continues today. rnThis paper presents a review of currently available offshore LNG transfer technologies and then presents a methodology of evaluation based on the total system design, safety and operability, equipment integrity, testing and certification and economics and timing to market. Results of the evaluation presented herein represent a snap shot of current status from the point of view of an operator evaluating offshore LNG terminals.
机译:在全球近海地区,无论是用于液化天然气出口还是用于液化天然气进口的液化天然气项目的未来发展,都需要对当前用于海上液化天然气转移的现有技术进行严格而全面的评估。浮动式海上设施和液化天然气运输船之间的液化天然气转移可以说是海上液化天然气开发整个链中最薄弱的环节。 rn由于链条的强度仅与链条的最弱部分一样强,因此当前的海上技术研发工作将精力集中在LNG传输系统和技术上。由于私营公司或通过联合工业项目(JIP)正在开发多种海上LNG转移技术,并且迫切需要将这些开发与不断发展的浮动海上LNG出口或接收终端项目联系起来,进行全面比较和严格评估ChevronTexaco于2000年启动了这些新兴的海上LNG传输技术,并一直持续到今天。 rn本文介绍了当前可用的海上LNG传输技术,然后提出了基于总体系统设计,安全性和可操作性,设备完整性,测试和认证以及经济性和上市时间的评估方法。从操作人员评估海上LNG接收站的角度来看,此处呈现的评估结果代表了当前状态的快照。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号