EGYPT’S PREMIER LNG PROJECT ESTABLISHES NEW INDUSTRY BENCHMARKS

机译:埃及的高级液化天然气项目建立了新的行业基准

获取原文
获取原文并翻译 | 示例

摘要

When the Union Fenosa Gas LNG project comes on stream it will not only be the first LNG project in Egypt but it will also be the largest capacity single LNG train facility ever built, having a capacity of approximately 5 MTPA. This LNG project will be producing LNG by the end of 2004, a mere 4½ years after its initial concept. The 4½ year period from concept to production is two years shorter, a 30% reduction, from the previous industry benchmark and a fraction of the industry norm. This LNG project is the first to be sanctioned and financed by a company outside the established international oil and gas community. This project will be the first base load LNG plant to process a feed gas from a national grid that has already been treated upstream in LPG plants or in onshore condensate removal facilities. The facility is totally self-contained and located at a greenfield site on the Mediterranean coast at the port of Damietta. rnThis paper addresses the current status of Egypt’s premier LNG project and key success factors including: rn1. Union Fenosa Gas as both the producer and main buyer of the LNG rn2. Technology selection • Design competition rn3. Largest single LNG train capacity rn4. Economies of scale ($/tpa) rn5.1 Short front end lead time and EPC schedule rn6.1 Early procurement of long lead equipment such as gas turbines, refrigerant compressors, LNG storage tanks, and spiral wound heat exchanger rn7.1 Selection of cooling medium (air cooled plant) rn8.1 Optimisation of the liquefaction process to maximise LNG production based on a Split MRTM cycle with two Frame 7 gas turbine drivers, helper motors, and liquid expanders
机译:Union Fenosa天然气液化天然气项目投产后,它将不仅是埃及的第一个液化天然气项目,而且还将成为有史以来建造的最大容量的单一液化天然气火车设施,产能约为5 MTPA。该液化天然气项目将于2004年底生产液化天然气,距最初构思仅4½年。从概念到生产的4.5年时间比以前的行业基准短了两年,减少了30%,只是行业规范的一小部分。这个液化天然气项目是第一个由已建立的国际石油和天然气界以外的公司批准和资助的项目。该项目将是第一个处理来自国家电网的原料气的基本负荷液化天然气工厂,该天然气已经在液化石油气工厂或陆上冷凝水去除设施的上游得到处理。该设施完全独立,位于达米埃塔港地中海沿岸的一个绿地上。本文讨论了埃及首要的液化天然气项目的现状以及成功的关键因素,包括:rn1。 Fenosa Gas联合公司是LNG rn2的生产商和主要买家。技术选择•设计竞赛rn3。最大的单一LNG火车容量rn4。规模经济($ / tpa)rn5.1较短的前端交货时间和EPC计划rn6.1尽早采购长铅设备,例如燃气轮机,制冷剂压缩机,LNG储罐和螺旋缠绕式热交换器rn7.1选择冷却介质(风冷设备)rn8.1基于带有两个Frame 7燃气轮机驱动器,辅助马达和液体膨胀器的Split MRTM循环,优化液化工艺以最大化LNG产量

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号