NIGERIA LNG: OVERCOMING TECHNICAL AND COMMERCIAL CHALLENGES TO BECOME ONE OF THE WORLD’S MAJOR EXPORTERS OF LNG

机译:尼日利亚液化天然气:克服技术和商业挑战,成为世界上主要的液化天然气出口国之一

获取原文
获取原文并翻译 | 示例

摘要

The very first LNG project proposed in Nigeria faltered in the early 1960’s.rnSubsequent efforts to build a LNG plant in Nigeria were unsuccessful until Nigeria LNG Limited (NLNG) was formed in May 1989. The NLNG shareholders decided to construct the base project, comprising two LNG trains, on Bonny Island in December 1995. The first LNG cargo was loaded in October 1999. Subsequently, a third LNG train has been operational and the EPC contract awarded for two larger capacity trains 4 and 5 in March 2002. The final investment decision for Train 6 is imminent.rnIt took several years of effort and perseverance to initiate the Nigeria LNG project. However, on completion of the 6th train, NLNG will produce about 22 mtpa of LNG, making it one of the world’s major exporters of LNG. On its journey to becoming a premier dependable LNG supplier, NLNG has faced several unique technical, execution and commercial challenges. These challenges were overcome in an innovative manner and converted to opportunities. This paper addresses the key elements that have contributed to making NLNG a successful project.rnThe following technology related issues are discussed in the paper:rn1. Feed gas changes and contribution to reducing flaring in Nigeriarn2. Choice of cooling medium for the plantrn3. Use of proven though improved technology over different phases of projectrnFrom a commercial standpoint, the following key issues and innovations are addressed:rn4. Integrated nature of the operation of the company in terms of managing operations, marketing and shipping functionsrn5.1 Successful financing by third partiesrn6.1 Commitment to Nigerianisation and local content programs based on professionalism and competencern7.1 Excellent community relationships and development programs
机译:在尼日利亚提出的第一个液化天然气项目在1960年代初就步履蹒跚。在1989年5月尼日利亚液化天然气有限公司(NLNG)成立之前,随后在尼日利亚建造液化天然气工厂的努力都没有成功。液化天然气的股东决定建造基础项目,该项目包括两个1995年12月在Bonny岛上的LNG火车。第一批LNG货物于1999年10月装船。随后,第三辆LNG火车投入运营,EPC合同于2002年3月授予了两辆大容量火车4和5。最后的投资决定火车6迫在眉睫。启动尼日利亚LNG项目需要花费几年的精力和毅力。但是,在第6列火车完工后,NLNG将生产约22 mtpa的LNG,使其成为世界上主要的LNG出口商之一。在成为主要的可靠LNG供应商的过程中,NLNG面临着数项独特的技术,执行和商业挑战。这些挑战以创新的方式得以克服,并转化为机遇。本文讨论了使NLNG成为成功项目的关键要素。rn本文讨论了以下与技术相关的问题:rn1。原料气的变化及其对减少尼日利亚火炬的贡献2。为工厂选择冷却介质3。从项目的各个阶段使用经过验证但经过改进的技术从商业角度出发,解决了以下关键问题和创新:4。公司在运营,营销和运输职能管理方面的综合性质rn5.1第三方成功融资rn6.1致力于尼日利亚化和基于专业知识和能力的本地内容计划rn7.1出色的社区关系和发展计划

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号