The Walt Whitman Bridge spans between Philadelphia,Pennsylvania and Gloucester,New Jersey,and is owned and operated by the Delaware River Port Authority (DRPA).This project is the first major rehabilitation of the bridge.The main bridge rehabilitation design featured many unique details,including 650,000 square feet of deck replacement,high strength steel tie plate replacement,pin and hanger retrofit,suspended span analysis,overnight deck replacement,and complicated friction collar jacking schemes to replace heavily loaded bearings for seismic performance.Traffic considerations were significant and mandated that all 6 traffic lanes be open for peak hours in order to carry the 110,000 daily vehicles.The entire rehabilitation design was completed on a fast track schedule of 11 months.This paper will discuss the background of the corridor rehabilitation program and will present some of the unique rehabilitation and retrofit measures.
机译:沃尔特·惠特曼大桥(Walt Whitman Bridge)横跨宾夕法尼亚州的费城和新泽西州的格洛斯特市,由特拉华河港管理局(DRPA)拥有并运营。包括650,000平方英尺的甲板更换,高强度钢连接板更换,销钉和吊架改造,悬架跨度分析,隔夜甲板更换以及复杂的摩擦环顶进方案以替换重载轴承以提高抗震性能。交通方面的考虑很重要且要求严格所有6条行车道均在高峰时段开放,以便每天运送11万辆车辆。整个修复设计已按11个月的快速计划完成。本文将讨论走廊修复计划的背景,并介绍一些独特的修复和翻新措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号