【24h】

Tianwan NPP Completion supported by Framatome ANP

机译:Framatome ANP支持的田湾核电厂完工

获取原文
获取原文并翻译 | 示例

摘要

Tianwan Nuclear Power Station could eventually consist of four 1000-MW units. Phase 1 isrnalready well underway with the construction of two Russian-designed VVER-1000 Modelrn"NPP 91" units. These two units are being built on the basis of international cooperationrnbetween the plant operator Jiangsu Nuclear Power Cooperation (JNPC), the plant designerrnAtom Energo Project (SPAEP) and Russian companies as well as a large number ofrninternational subcontractors. Chinese enterprises are responsible for civil construction as wellrnas system erection and startup. Unit 1 is scheduled to go on line in December 2004, with Unitrn2 following one year later.
机译:田湾核电站最终可能由四个1000兆瓦机组组成。第一期工程已经进行得很顺利,建造了两台俄罗斯设计的VVER-1000型“ NPP 91”装置。这两个单位是在工厂运营商江苏核电合作公司(JNPC),工厂设计者原子能项目(SPAEP)与俄罗斯公司以及众多国际分包商之间的国际合作基础上建立的。中国企业负责Wellrnas系统的架设和启动的土建工程。 1号机组计划于2004年12月投入使用,而Unitrn2号计划于一年后投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号