首页> 外文会议>10th International Symposium on Tubular Structures; Sep 18-20, 2003; Madrid, Spain >Explicit FE simulations of large-scale tests on beam-to-RHS column connections
【24h】

Explicit FE simulations of large-scale tests on beam-to-RHS column connections

机译:梁到RHS色谱柱连接的大规模测试的显式有限元模拟

获取原文
获取原文并翻译 | 示例

摘要

One of the important surprises of the Northridge and Kobe earthquakes was the widespread and unanticipated brittle fractures in welded steel beam-to-column connections. Since then, numerous research programmes have been conducted to improve the performance of moment loaded connections. As part of a project to develop and evaluate a new design concept, Miura et al. (2002) reported the results on three beam-to-RHS-column connections without weld-access holes under cyclic loading. The large-scale specimens included both welded and bolted connections. The current study presents numerical simulations of two of the three specimens tested by Miura et al. (2002) employing the explicit solution technique. Various issues of the explicit FE strategy such as mesh density, computational time and numerical simulation of the loading process are addressed. A comparison between the experimental and numerical hysteresis loops is presented. In addition, the advantages of the use of the explicit method relative to the implicit approach are highlighted.
机译:Northridge和Kobe地震的重要意外之一是在焊接的钢梁到柱连接中出现了广泛而出乎意料的脆性断裂。从那时起,进行了许多研究计划以提高力矩加载连接的性能。作为开发和评估新设计概念的项目的一部分,Miura等人。 (2002年)报道了在循环载荷下三个无焊接孔的梁到RHS柱连接的结果。大型样本包括焊接和螺栓连接。当前的研究提供了Miura等人测试的三个样本中的两个样本的数值模拟。 (2002年)采用显式求解技术。解决了显式有限元策略的各种问题,例如网格密度,计算时间和加载过程的数值模拟。给出了实验和数值磁滞回线之间的比较。此外,突出显示了使用显式方法相对于隐式方法的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号