首页> 外文会议>The 10th International Conference on Enhancement and Promotion of Computational Methods in Engineering and Science (EPMESC X) >Pretensin Simulation of the Long Span Truss String Structures Supported by the Temporary Structures
【24h】

Pretensin Simulation of the Long Span Truss String Structures Supported by the Temporary Structures

机译:临时结构支撑大跨度桁架弦结构的Pretensin模拟

获取原文
获取原文并翻译 | 示例

摘要

During the pretension of the truss string structure (TSS), the stiffness and integrity of structure are improved since the tension of the string. Before pretension, lots of falseworks are set up in order to supply the temporary support for the upper truss. The reasonable pretension of the string commonly conforms a principle that the upper truss is just moved up from the falseworks. Therefore, the critical point of the pretension method is how to precisely simulate the mutual effects of the elastic falseworks and the truss. The pretension process of the museum roof structure of Yantai world trade center is taken as an example to do the pretension simulation analysis in this paper. The calculation model, in which the mutual effects of the elastic falseworks and the truss are considered, is created. The pretension of the TSS is stimulated. The numerical simulation data, which are valuable reference for simulating structure construction, are provided.
机译:在桁架弦结构(TSS)的预张紧期间,由于弦张紧,因此提高了结构的刚度和完整性。在预张紧之前,会设置许多脚手架,以便为上桁架提供临时支撑。琴弦的合理预紧度通常符合一个原理,即上部桁架刚从吊架上移下来。因此,预紧方法的关键是如何精确地模拟弹性脚架和桁架的相互影响。本文以烟台世界贸易中心博物馆屋顶结构的预应力过程为例,进行了预应力模拟分析。建立了计算模型,其中考虑了弹性脚架和桁架的相互影响。刺激TSS的预紧。提供了数值模拟数据,为模拟结构施工提供了有价值的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号