首页> 中文会议>第一届环境影响评价国际论坛 >Issues and Future of SEA in Korea

Issues and Future of SEA in Korea

摘要

Since 1981, EIA has been introduced in the decision-making process for the consideration of theenvironmental impact of large scale development project in Korea. But the EIA system has somesignificant problems. The EIA system has been carried out after policies or plans or strategic decisions have been already fixed. At the result, the EIA system can have only limited roles such as the suggestion of mitigation measures, at best, limited range of alternatives. The EIA system cannot consider the cumulative impacts such as additive impacts, synergistic impacts, threshold or saturation impacts, induced and indirect impact and so forth (Therivel, et al., 1992) .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号